Assembly time
The assembly of balconies or loggias is a matter of a few days.
Our assembly work is done quickly with the aid of mobile cranes, without scaffolding. It is however essential to have full access to the house for the mobile crane and adequate space for its operation. The crane has to lift the balcony to the necessary height, where it is fastened into position by our specialists for work in heights using mountain-climbing techniques.
The balconies are fastened on the building’s external wall – access to the interior of the apartments is required only exceptionally.
When mounting balconies on houses that we winterize with external insulation concurrently, our workers use gloves and boot covers, and carry special containers for catching chipped masonry from drilling. Thus, our work does not soil the new façade, as all we do is hang up the balconies.
When finishing the balcony installation, we close the dilation gap between the balcony and wall with special molding.